Frustrated by 405 Construction?

2

Posted by Traffic | Posted in Neighborhood Council, Traffic | Posted on 04-11-2011

Then you should attend an upcoming community meeting on November 17, 2011:

  • Thursday, November 17, 2011
  • 6:00pm – 8:00pm
  • Westwood Recreational Center – 1350 South Sepulveda Blvd, Room C

For more information, download this flyer: November 17, 2011 Metro Meeting.

Comments (2)

Hi,
there is the appearance of signs and construction equipment on Beverly Glen that leads me to believe that the city is going to repave the Glen. Is this the case and if so can you provide details?
Thank you.
Bob Kollender

Hi Bob –
The City is repaving Oletha Lane right now. Oletha sustained some serious damage last winter with a tree falling down.

I have been told that it’s possible that the City will be repaving our side of Beverly Glen in the next fiscal year, which would start next July 1. But I have not confirmed that and I would not count on it. I was surprised when they repaved the Valley side, and it’s really only about halfway down the hill.

If you would like to encourage them to repave our side of Beverly Glen, I would very much encourage you to call Jeff Ebenstein in Councilman Paul Koretz’s office and ask for that. You can reach him at 818-971-6969 or by e-mail, jeffrey.ebenstein@lacity.org.

Write a comment