Posted by Traffic | Posted in Traffic | Posted on 21-03-2013
LADWP reminds city residents and businesses that construction will start this Saturday on the replacement of a portion of the City Trunk Line, a 60-inch diameter pipeline that runs along Coldwater Canyon Avenue between Mulholland Drive and Ventura Boulevard, necessitating closure of the major thoroughfare from March 23-April 25.
The closure is necessary to allow the full use of the street for construction equipment and crews. LADWP is replacing the 99-year old pipe in sections with new welded steel pipe as part of an ongoing citywide upgrade to major pipelines in order to ensure reliable service and to comply with federal water quality regulations.
The closure will begin Saturday, March 23, and continue through Thursday, April 25. The hours of closure are Monday through Friday, from 8:30 a.m. to 7 p.m., and Saturday from 8:30 a.m. to 6 p.m. After 7 p.m. each night, 6 p.m. on Saturdays, and all day Sunday, one lane will be open for traffic in each direction.
Beverly Glen residents should anticipate additional traffic during the time of the closure of Coldwater Canyon. For those residents newly commuting through Beverly Glen, please remember that we are a residential community, in addition to a commuting thoroughfare.
For more information, please click here.