Posted by Traffic | Posted in Traffic | Posted on 06-11-2014
The Los Angeles Bureau of Street Services Resurfacing Division has scheduled Phase II of resurfacing for Beverly Glen on Saturday November 15, 2014 and Sunday November 16, 2014. The 1.6 mile segment of resurfacing will be from Beverly Glen Place to Greendale Drive. The department will be profiling on Saturday the 15th and will repave the following day on Sunday the 16th, with an estimated 4100 tons of asphalt. The resurfacing crew will begin at 6:00am and will be done before 5:00pm on both days.
The department will only allow local traffic but no through traffic between Greendale Drive and Beverly Glen Place, as they will have many trucks and heavy equipment working within the narrow roadway. This is especially true on Sunday when they pave. Message boards will be placed this week at Mulholland Drive and Sunset Blvd to inform residents and motorists of the road construction and intended street closure, also advising all to use an alternate route. Emergency Response Vehicles will be given full access to their destination.
The Official Notice for the Project can be viewed here: Notice of Street Work