Updated Charing Cross and Hilgard Bypass Line
Changes to drinking water quality regulations require open air reservoirs to be covered, bypassed, or removed from service. To comply with these regulations, the LADWP will be installing a floating cover on Upper Stone Canyon Reservoir, which is located in the Beverly Glen area and currently services the adjacent communities and the UCLA campus. LADWP will temporarily remove Upper Stone Canyon Reservoir from service in order to install the cover. Before this can be done, the LADWP must install a new water pipeline to provide continued water deliver to the surrounding communities while the reservoir is temporarily removed from service.
Project Description
LADWP will install approximately 385 feet of 36-inch diameter water pipeline at Sunset Boulevard and Hilgard Avenue. The large diameter pipeline, known as the Charing Cross and Hilgard Bypass Line, will connect to existing infrastructure at the intersections of Sunset Boulevard and Hilgard Avenue and along Hilgard Avenue south of Charing Cross Road. The new pipeline will ensure continued water deliver to the surrounding communities while the reservoir is out of service, and will also provide improved redundancy in the system necessary for future maintenance and in case of emergency.
Construction will require traffic modifications along Sunset Boulevard and Hilgard Avenue from mid-June 2015 to January 2016. LADWP has coordinated this work with UCLA and Metro in order to complete the construction along Sunset Boulevard before fall classes at UCLA resume in an effort to reduce the traffic impacts to the area. Refer to the dates and maps under Construction Details below for additional traffic information.
Construction Details (Dates are estimates)
Phase 1: June 15, 2015 – August 2015
Sunset Boulevard at Hilgard Avenue
Monday through Friday, 7 a.m. to 6 p.m.; Saturdays, 8 a.m. to 4 p.m. with occasional work until 9 p.m.
Traffic Changes:
• Sunset Boulevard Eastbound: No turns onto Hilgard Avenue or Copa de Oro Road.
• Sunset Boulevard Westbound: No left turn onto Hilgard Avenue.
• Copa De Oro Road Southbound: Right turn onto Sunset Boulevard only.
• Metro Bus Detours: Lines 734, 234, and 2-302 (westbound only)
Phase 2: August 2015 – September 2015
Hilgard Avenue
Monday through Friday, 7 a.m. to 4 p.m. with occasional evening and Saturday work.
Traffic Changes:
• Hilgard Avenue reduced to one lane in each direction between Sunset Boulevard and Comstock Avenue.
• Metro Bus Detours: Lines 734, 234, and 2-302 (westbound only)
Phase 3: September 2015 – January 2016
Hilgard Avenue south of Charing Cross Road
Monday through Friday, 7 a.m. to 4 p.m. with occasional evening and Saturday work.
Traffic Changes:
• Hilgard Avenue reduced to one lane in each direction next to the work area.
• Hilgard Avenue Northbound: No left turn onto Charles E. Young Drive.
• Metro Bus Detours: Lines 734, 234, and 2-302 (westbound only)
LADWP Contact Information
Joseph O’Hara
Construction Superintendent
(213) 792-5471
Marvin Hermosillo
Construction Engineer
(213) 367-1089