UPDATED: Tree Trimming on Beverly Glen Begins This Week

0

Posted by Traffic | Posted in Community Messages, Emergency Preparedness, Traffic, Uncategorized, Zoning & Development | Posted on 13-04-2012

Neighbors:

Most of the information below is accurate.  Trimming should begin on Thursday, 4/19.  Please abide by the No Parking signs or your car may be towed.

The Los Angeles Fire Department has hired a contractor to trim trees along Beverly Glen.  The scheduled times and a description follows.

Your Traffic Committee Chair has discussed the impact on traffic and LAFD will be asking the contractor to do work on weekends on our side whenever possible, and not to set up in the morning until after 10 am, to avoid disrupting the morning commute.  We believe they will make best efforts to keep traffic flowing when at all possible.

Trimming will be on the weekends starting at Valley Vista on 4/14 and moving up the hill and on week days starting at Parkwood/De Neve Park on 4/16 and moving up the hill.  The Sherman Oaks trimming will be four successive weekends, and Beverly Glen four successive weeks, ending around May 15 (see note above about our having requested weekend trimming if possible).The contractor will keep two lanes of traffic moving whenever possible, but these lanes will be narrowed and the speeds greatly reduced.  When needed, they will stop traffic entirely for up to 3 minutes at a time.  No parking notices will be posted along sections of street before the crews come and although it is a last resort, vehicles will be towed to gain access to trees or to avoid damage to them during trimming.  Morning trimming will be on the east side of the boulevard starting with equipment set-up at 7:00 10:00 am 7:00 am, then switching to the west side.  Work will be done by 2:30 pm each day.  Signs will be placed at Sunset and Mulholland for the duration of the project advising that traffic will be delayed.

The planned segments for work (approx 2 days each) are as follows:

1. Parkwood to Greendale
2. Greendale to Hollybrush
3. Hollybrush to Fernbush
4. Fernbush to Crater
5. Crater to Caribou
6. Caribou to Seabury
7. Seabury to Ravenwood
8. Ravenwood to Nicada
9. Nicada to Beverly Glen Circle
10. Beverly Glen Circle to Mulholland
11. Sunset to Parkwood (fit in as traffic allows)

The trimming will be raising canopy up to 14 feet and in some places bringing the canopy back in places.  There will be lots of raising of small branches and removal of dead wood.  There will also be trimming back of hedges and other thick vegetation that extends into the roadway (e.g., ficus hedges, bamboo, etc.).  The Fire Department has made every effort to accommodate protected tree species (e.g., oaks and sycamores) while cleaning up hazardous situations such as dead wood and peeling bark on eucalyptus trees.  Volunteers from Residents of Beverly Glen have been working very closely with the Brush Clearance Unit to protect our beautiful tree canopy where possible.

For more information about the project, please contact the LAFD Brush Clearance Unit: John Novela, 818-778-4927.

Mullholland Bridge Closures

0

Posted by Traffic | Posted in Community Messages, Traffic | Posted on 05-04-2012

The Mulholland Bridge will be closed frequently for night time work between April 4, 2012 and August 4, 2012.

Metro and their contractors are working to relocate utilities associated with the improvements to the 405.

For more information, please visit Metro’s website, http://www.metro.net/projects/i-405/.  This site is updated regularly with all closures listed.

You can also learn more by downloading this informational flyer:

Mulholland Bridge Closure Notice – Utilities Relocation

Be aware that the 405 Wilshire Blvd. on- and off-ramps will be closed for 30- to 90-day periods over the next several months.  There are 8 on- and off-ramps and they will be closed in pairs.  We will endeavor to bring you the most updated information possible, when available.

Thanks for driving courteously in the Glen!

MAXINE IS HOME

0

Posted by ROBGWebsite | Posted in Community Messages | Posted on 04-04-2012

Maxine is safely home.

LOST DOG – MAXINE

0

Posted by ROBGWebsite | Posted in Community Messages | Posted on 04-04-2012

Lost dog, Maxine, last seen around 1800 block of N. Beverly Glen, white with brown spots, picture below, please contact Jim Earnhardt at jimearnhardt@mac.com with any information.

405 Closure Schedule – 3/23-3/24

0

Posted by ROBGWebsite | Posted in Community Messages, Traffic | Posted on 23-03-2012

Construction Notice: I-1405 Sepulveda Pass Improvements Project

Councilmember Paul Koretz and his staff would like to share with you the following construction updates regarding the Mulholland Bridge and the 1-405 San Diego Freeway provided by Metro:

ATTENTION RESIDENTS AND BUSINESSES IN THE VICINITY OF THE MULHOLLAND BRIDGE AND THE I-405 SAN DIEGO FREEWAY

The contractor is scheduled to implement additional full directional freeway closures in order to further construct the falsework structure for the Mulholland Bridge. The falsework structure is designed to facilitate the reconstruction by providing temporary support to the bridge. The directional full freeway closures will be from the 101 freeway to the Getty Center Dr. ramps, weather permitting. Each night, ramps within the freeway closure limits may begin to close as early as 7:00 pm and freeway lanes will begin to close as early as 11:00 pm, leading up to the full directional freeway closure between 1:00 am and 6:00 am.

Anticipated closure schedule:

March 23 – Northbound I-405 freeway from Getty Center Drive to Ventura Blvd. (freeway lanes closures staring at 11:00 pm)

March 24 – Southbound I-405 freeway from the 101 freeway to Getty Center Dr. (freeway lanes closures staring at 11:00 pm)

What: Falsework construction to support the reconstruction of the Mulholland Bridge

When: Full directional freeway closures are anticipated to resume Friday, March 23, 2012, and occur for a total of approximately two nights, weather permitting. Each night, ramps within the freeway closures limits may begin to close as early as 7:00 pm and freeway lanes will begin to close as early as 11:00 pm, leading up to the full directional freeway closure beginning at 1:00 am.

Where: Between the Getty Center Dr. ramps to the 101 freeway

What to expect:

– Sepulveda Blvd. will remain open during the nights of the full directional freeway closures and will be used as a detour route. Detour maps are available at www.metro.net/405

– Emergency access will be maintained at all times

– For a listing of daily closures and latest updates visit our website at www.metro.net/405 or follow us on twitter: twitter.com/I_405 and Facebook at facebook.com/405project

 

LA Marathon Street Closure Information

0

Posted by Traffic | Posted in Community Center, Community Messages, Events, Neighborhood Council, Traffic, Uncategorized | Posted on 15-03-2012

The LA Marathon is this Sunday, March 18th.

Please be aware of local road closures this Sunday morning (3/18) starting at midnight, and ending throughout the day due to the LA Marathon:

Street Closed From Closed To Time Closed Time Open
 S Santa Monica Blvd Rexford Dr Sepulveda Blvd 5:00AM 1:00PM  
Rodeo Dr Santa Monica Blvd Wilshire Blvd 5:00AM 1:00PM  
Wilshire Blvd Beverly Dr Santa Monica Blvd 5:00AM 1:00PM  
Santa Monica Blvd Wilshire Blvd Sawtelle Blvd 5:00AM 2:04PM  
Sepulveda Blvd S. Santa Monica Blvd Wilshire Ave 5:00AM 2:04PM  
Ohio Ave Veteran Ave Sawtelle Blvd 5:00AM 2:20PM  
Sawtelle Blvd Santa Monica Blvd Dowlen Dr 5:00AM 2:20PM  
Dowlen Dr Bonsall Ave Wadsworth Pl 5:00AM 2:20PM  
Bonsall Ave Dowlen Dr Eisenhower Ave 5:00AM 2:20PM  
Eisenhower Ave Bonsall Ave Bringham Ave 5:00AM 2:20PM  
San Vicente Blvd Wilshire Blvd Ocean Ave 5:00AM 5:00PM  
Ocean Ave San Vicente Blvd Pico Blvd 12:00AM 5:00PM  
Beverly Glen Blvd Wilshire Blvd Santa Monica Blvd 5:00AM 1:50PM  
Westwood Blvd Wilshire Blvd Santa Monica Blvd 5:00AM 2:05PM  
Massachusetts Ave Sepulveda Blvd Cotner Ave 5:00AM 2:20PM  
Barrington Ave Montana Ave Dorothy St 5:00AM 2:40PM  
Montana Ave Bringham Ave Bundy Dr 5:00AM 2:55PM  
Bundy Dr Dunoon Ln Montana Ave 5:00AM 2:55PM  
26th St La Mesa Way Georgina Ave 5:00AM 2:55PM  
Main St Colorado Blvd Olympic Dr 12 Midnight 4:00PM  

For a complete list of road closures please see:

http://www.lamarathon.com/community/street-closures/

 

 

LAPD Burglery Warning

0

Posted by ROBGWebsite | Posted in Community Messages | Posted on 10-03-2012

As we’ve posted before, be aware of anyone posing as a City inspector, DWP worker or anyone claiming they have an appointment or need to enter your home unless you scheduled an appointment.  If unsure, ask for ID and call that department or agency to confirm they have a person visiting your home, better to be embarrassed and safe that let burglars in your home.

Click here for latest warning and if you have seen these people, call the number on the post:

LAPD Burglary Warning

LADWP and LAFD Attending ROBG Meeting

0

Posted by ROBGWebsite | Posted in Board Meetings, Community Messages | Posted on 09-03-2012

At the next ROBG meeting, Monday, March 12, 7:30pm, LDRCC, 10409 Scenario Lane, LADWP, LAFD and Council office will send representatives to discuss the following:

  • Road repair on Beverly Glen for water break,
  • Tree canopy clearance on Beverly Glen.

All residents are welcome to attend, please note that while we want everyone to provide their input, please come with very specific notes and recommendations for LADWP and LAFD so that they can take back good input to their respective agencies.  Although we have issues with how things were dealt in the past, the goal is to show them we can provide valuable input on how they should progress to minimize impact to residents.

Of course we also have a full ROBG agenda as usual so need to make sure we get through those.  Feel free to email your recommendations/input if you cannot attend or look forward to seeing you Monday!

Your ROBG at work!

ROAD CLOSURE

4

Posted by ROBGWebsite | Posted in Community Messages, Traffic | Posted on 02-03-2012

Apparently LA DWP has decided do close Beverly Glen again, without notice to us or our Councilman’s office.  They expect to be done soon but who knows, so plan accordingly and stay tuned.

This time though, we can’t stay quiet, we ask all residents to call the following numbers and let DWP know how much of an inconvenience this is to our community.  We know we may need Beverly Glen shut down to repair the road but let us know so we can let you all know so you can plan accordingly and for decency’s sake, not on a Friday!

All residents, call:

213.367.1063 – We think this is the Head of Water Service Division’s Office, Joe Castaranto (sp?), also call
1-800-DIAL-DWP, Customer Service

We were patient and understanding last time and impressed upon them through our strongest advocate, our Councilman’s office, to coordinate with us so we can get the word out.  This time, they need to hear from us.

We’ll keep you posted as we hear more as well.

ROAD CLOSURE UPDATE

1

Posted by ROBGWebsite | Posted in Community Messages, Traffic | Posted on 24-02-2012

Thanks to all residents for updates, seems Beverly Glen is open all the way through, I would still give yourselves time to get home, it is Friday after all.

We’ll monitor what work will need to be done and keep you all posted.